Woodland Capacity and Creek Crossing Project

Replace existing pipelines by open-cut and removal and replacement (~1,100 LF), replacing existing sanitary sewer by pipe bursting (~2,140 LF), installation of pipes using horizontal directional drilling (~490LF), including sawcut, excavation and backfill, shoring, replacing laterals, disconnecting and reinstating lateral connections, abandoning existing sewer pipelines and manholes, removing existing cleanouts and manholes, constructing new manholes and property line cleanouts, asphalt concrete pavement restoration, CCTV inspection, traffic control, project signs, and bypass pumping of sanitary sewer flow.
Addendum 1 (click to expand/collapse)
Name Size
RVSD Woodland SS Addendum 1 197.3 KB